Production Part Approval Process

Catalog Area: Quality
Duration: 08 Hrs.
Modality: online and Face-to-face modality

Receive a Course Pre-Quote by Email

Let a Sales Advisor Contact You by Email

Temarios Cursos- Inglés

Receive complete information in your email!

  • Consultek uses the information you provide us to contact you about our relevant content, products and services. You will be able to unsuscribe from these communications at any time. For more information, see our privacy policy.

  • This field is for validation purposes and should be left unchanged.

OBJECTIVE:

  • Plan, integrate, review, and submit a PPAP package in accordance with AIAG PPAP 4th Edition, 2nd Printing and Customer Specific Requirements (CSR), verifying evidence derived from current Core Tools.

  • Demonstrate through objective evidence and a significant production run that the manufacturing process can consistently produce conforming parts to customer design and specification requirements, while managing submission levels, PSW, engineering changes, and approval statuses.

  • Updated to AIAG PPAP 4th Edition, 2nd Printing.

BASIC COURSE INFORMATION:

ADDRESSED TO:

Quality, Engineering, Production, APQP/New Product Introductions, Supplier Quality, Metrology, Laboratory, Supervisors, Managers, and personnel responsible for integrating, reviewing, or approving PPAP submissions.

Competencies to Develop: Integration and review of PPAP packages, Core Tools traceability, evidence evaluation, change management, PSW, and Customer Specific Requirements.

 

SYLLABUS

Module 1. PPAP Fundamentals and Purpose: Purpose, scope, applicability, and relationship with IATF 16949, APQP, FMEA, Control Plan, MSA, SPC, and Customer Specific Requirements (CSR).

Module 2. PPAP Submission Requirements and Change Management: Initial submission criteria, customer notification rules, changes requiring authorization or resubmission, and coordinated Core Tools updates.

Module 3. Significant Production Run: Operational conditions (equipment, tooling, operators, material, environment, line speed, and cycle time); part traceability, test results, and evidence collection.

Module 4. The 18 PPAP Requirements: Requirements 1–6 (Design Record, Authorized Engineering Changes, Customer Engineering Approval, DFMEA, Process Flow Diagram, PFMEA); Requirements 7–12 (Control Plan, MSA, Dimensional Results, Material/Performance Test Results, Initial Process Studies, Qualified Laboratory Documentation); Requirements 13–18 (AAR, Sample Production Parts, Master Sample, Checking Aids, CSR, Part Submission Warrant – PSW).

Module 5. Submission Levels 1–5: Submitted documentation versus retained/accessible evidence; selection of submission levels based on customer directives.

Module 6. Part Submission Warrant (PSW) and Approval Status: Preparation and technical review of the PSW; Approved, Interim, and Rejected statuses, operational impacts, and follow-up on open items.

Module 7. Technical Package Review: Consistency across Engineering Drawing/Spec ↔ FMEA ↔ Control Plan ↔ MSA/SPC ↔ Inspection Results; special characteristics, revision levels/dates, and non-conformance disposition.

Module 8. Record Retention, CSR, and Post-Approval Maintenance: Records, samples, and evidence retention rules; customer-specific guidelines and PPAP package maintenance following design/process changes or quality issues.

Module 9. Practical Workshop and Assessment: Hands-on review of a PPAP folder with missing/inconsistent evidence, determination of submission levels, pre-PSW action plan, and internal release decision.

BENEFITS

  • Integrate complete and consistent PPAP packages.

  • Reduce rejections caused by inconsistent or missing evidence.

  • Strengthen end-to-end traceability across requirements, risks, controls, and inspection results.

  • Manage engineering/process changes and Customer Specific Requirements effectively.

  • Improve readiness for customer approval and quality system audits.

  • Technical references: AIAG PPAP 4th Edition, 2nd Printing (including current Errata), IATF 16949:2016, AIAG APQP 3rd Edition, AIAG Control Plan 1st Edition, AIAG & VDA FMEA Handbook, AIAG MSA 4th Edition, AIAG & VDA SPC 1st Edition, applicable CSR.