Receive complete information in your email!
Apply the fundamentals of APQP 3rd Edition to plan and monitor product and process launches across its five phases, integrating customer requirements and cross-functional teamwork.
Identify the key changes in the 3rd Edition: gated management, risk assessment and mitigation, sourcing, program metrics, change management, and traceability, maintaining alignment with other Core Tools.
Updated to AIAG APQP (3rd Edition).
Leaders, managers, supervisors, and department heads; personnel responsible for Quality, Engineering, Production, APQP/New Launches, Supplier Quality, Projects, and staff preparing for this level.
Module 1. Fundamentals and Key Changes in APQP 3rd Edition: Preventive purpose, evolution from APQP 2nd Edition, and formal separation of the Control Plan as an independent manual.
Module 2. APQP Program Management: Cross-functional team, scope, timing, milestones, deliverables, gated management, and program metrics.
Module 3. Risk and Change Management: Risk assessment/mitigation, sourcing, change management, part traceability, and lessons learned.
Module 4. Phase 1 – Plan and Define Program: Voice of the customer, CSR, targets, feasibility, and preliminary special characteristics identification.
Module 5. Phase 2 – Product Design and Development: DFMEA, DVP&R, specifications, special characteristics, and design verification/validation.
Module 6. Phase 3 – Process Design and Development: Flowchart, PFMEA, process design, MSA/SPC planning, and control strategy.
Module 7. Phase 4 – Product and Process Validation: Production trial run, MSA, initial process performance/capability studies, validation, and PPAP readiness.
Module 8. Phase 5 – Feedback, Assessment, and Corrective Action: Launch performance, variation reduction, change management, and Core Tools updates.
Module 9. Practical Workshop and Assessment: Review of an APQP Timing/Gate Review, risks, and consistency across APQP → FMEA → Control Plan → MSA/SPC → PPAP.
Plan launches using a preventive, risk-based approach.
Strengthen cross-functional coordination and gate review tracking.
Improve requirements and change management traceability.
Ensure seamless integration of APQP with FMEA, Control Plan, MSA, SPC, and PPAP prior to mass production.
Technical references: AIAG APQP 3rd Edition, IATF 16949:2016, AIAG Control Plan 1st Edition, AIAG & VDA FMEA, AIAG MSA 4th Edition, AIAG & VDA SPC 1st Edition, AIAG PPAP 4th Edition, applicable Customer Specific Requirements (CSR).